Hazara / Haripur Seismic Zone-3 Safety Manual

How to detail steel and masonry so your house stays standing — and stays repairable — when the ground shakes.

← Encyclopedia

1. Why Haripur needs this

Haripur and the Hazara division sit close to the fault system that produced the October 2005 Kashmir/Hazara earthquake. Pakistan's Building Code (BCP-SP 2007) places this region in Seismic Zone 3 (design ground acceleration roughly 0.24–0.32 g — confirm the exact value for your plot with your structural engineer). Buildings here must be designed for sideways shaking, not just the weight of the roof.

What killed people in 2005

Heavy concrete slabs on weak, un-tied brick walls and under-reinforced columns with widely spaced, poorly-hooked ties. The slab came down as one piece. Everything below is aimed at stopping exactly that.

2. Reinforcement detailing: 135° seismic hooks

Ring ties hold the main bars from buckling and keep the concrete core confined. Many thekedars bend rings with a quick 90° hook because it is faster. In an earthquake the outer concrete cover spalls off first — and a 90° hook, sitting in that cover, simply opens. A 135° hook is anchored in the core and keeps the ring closed.

✗ 90° hook (weak)✓ 135° hook (seismic)Tail runs along the face, inside the cover.Shaking spalls the cover → hook opens →bars buckle outward, column crushes.Tails bite into the concrete core,so the ring stays closed even afterthe cover falls off. Tail ≥ 3 in (75 mm).vsPlan view of a column (looking down). Dark circles = main bars; line = ring tie.
Column plan view — weak 90° hook vs. seismic 135° hook.
ItemSeismic Zone-3 requirement
Ring-tie hook135° both ends, tail ≥ 6 × bar dia and ≥ 3 in (75 mm)
Ring spacing (column ends & joints)3–4 in c/c over the top & bottom 2 ft (or column depth ×1.5), and inside the beam-column joint
Ring spacing (mid-height)Max 6 in c/c, ring bar not thinner than 3/8 in (#3 / 9.5 mm)
Column main barsMinimum 4 bars, Grade 60; avoid 9×9 in columns for two storeys or more — ask your engineer for 9×12 in or larger
Lap splice of column barsSplice in the middle third of the storey, never at the joint; stagger 50 % of bars; lap ≈ 50 × bar dia
ConcreteNot leaner than 1:2:4 (1:1.5:3 for columns/footings), clean crush ≤ ¾ in, water-cured ≥ 14 days

Check on site

Walk the cage before concrete: are rings tighter near the top and bottom of every column? Do ring ends angle into the core? If the mistri says “90° is also fine” — stop the pour. Use our Site Inspector checklist.

3. Continuous plinth beam, lintel band & roof ties

During a tremor, different parts of the ground move by different amounts. A continuous RCC plinth beam over the footing makes the whole base move as one rigid ring, which prevents differential settlement and keeps cracks from running up the walls. A continuous lintel band (not just short lintels over openings) and a roof band do the same at the top and tie every wall to the slab.

Footing (RCC, continuous)Plinth band / DPC beamSill band (windows)Lintel band (continuous)Roof slab + roof bandVertical tie columnscorners, T-junctions, door/window jambsBox action: every wall tied to every other wall and to the footingBands must run continuously around the building — never stop at openings or corners.
Elevation: bands run unbroken around the house; vertical columns tie them together.
  • Plinth beam: at least 9 in wide × 6–9 in deep, 4 bars (#4) with rings at 6 in, poured continuously — no gaps at doors (take bars through the sill).
  • Lintel band: full wall thickness, same level all round; windows and doors share one level so the band never steps.
  • Overlap bars at corners and T-junctions with an L-bend of at least 24 in so the bands act as one ring.
  • Roof slab bars must be hooked into the lintel / roof band; never leave a slab simply resting on bare brickwork.
  • Parapets, water-tank stands and mumty must be tied to the slab with dowel bars — they swing hardest in a quake.

4. Why plain masonry cracks (and how tie columns stop it)

Brick is strong when squeezed but weak when pulled or sheared — and shaking does both. Without vertical tie columns, the walls are just stacks of bricks: they crack diagonally from window corners, separate at the wall corners and fall outward. Small RCC tie columns at every corner, wall junction and door/window edge, joined by the bands above, lock each wall panel into a frame (“confined masonry”).

✗ No tie columns / bands✓ Confined masonryGround shaking ⇄Ground shaking ⇄X-cracks at window corners; walls splitat corners and fall outward.Frame confines each panel; only hairlinecracks — wall stays up, people can escape.
Same wall, same shaking — without and with tie columns and bands.
  • Tie columns: min 9×9 in with 4 bars #3–#4 and rings at 6 in (3–4 in near ends); build the wall first with toothed (alternate-brick) edges, then pour the column against it.
  • Mortar: cement:sand 1:4 for load-bearing walls (1:6 only for partitions); keep joints 10–12 mm and completely full.
  • Wall panels longer than about 12 ft or taller than ~10 ft need an extra tie column or band.
  • Openings: keep them small and away from corners (≥ 2 ft), total opening ≤ about 40 % of a wall length.
  • Never remove or notch a column or tie column later for plumbing or a new door.

5. Foundation & site basics

  • Get a soil bearing-capacity test before fixing footing size; hillside plots in Hazara need slope-stability advice too.
  • Found everything on the same type of firm soil at the same level; never half on rock, half on fill.
  • Keep the plan simple and symmetric: avoid heavy cantilever balconies, large open ground floors (“soft storey”) and L/T shapes without a joint.
  • Prefer light roofing above the last floor; heavy water tanks high up add shaking force.

6. Put it to work

Advisory only

This guide is general advice for Haripur / Hazara homeowners. It does not replace a site-specific design by a registered structural engineer (PEC), a soil test, or legal advice from a lawyer. Always follow the approved drawings.