Quick Calculator
Material list for one wall, floor, slab, column or beam
Small repair or a single room? Get the exact bricks, cement, sand, crush, steel and labor in seconds — with safety checks.
Wall (brick + plaster)
No safety issues found in the numbers you entered. This is only a screening check — confirm with an engineer.
In Hazara tie brick walls with RCC bands (plinth, sill, lintel, roof) and tie columns at corners.
Alfalah Property
Opposite Govt. Post Graduate College (for Women), West Circular Road, Haripur Hazara, KPK
+92 300 0000000
Material Parchie / Quotation
15/10/2026
Wall (brick + plaster)
| Item | Quantity to buy | Est. cost |
|---|---|---|
| Bricks (incl. 5% breakage) | 956 nos | 17,208 |
| Cement | 4.5 bags | 6,075 |
| Sand | 23 cu. ft. | 1,955 |
| Materials subtotal | 25,238 | |
| Labor – contract | 11,860 | |
| TOTAL (PKR) | 37,098 |
- Wall area: 100 sq ft
- Plaster area: 200 sq ft
Estimate at current Alfalah market rates; quantities include normal wastage. Prices change — please verify before buying. Not a structural design.
Labor: Contract vs. Dihari
For this job a contract saves about PKR 2,140. Dihari needs your supervision and risks wasted time; a contract fixes the price but check what it includes.
Estimated worker-days
- Mason (Mistry / Raj): 3
- Laborer (Mazdoor): 3.5
- Steel fixer: 0
Change daily wages (PKR/day)
Default wages are set by Alfalah. Worker-days are rule-of-thumb and vary by site.